Skip to main content

 icon rounded facebook    icon youtube

0
0

Maintenance work of the lightning system Tycoons Worldwide Group (Thailand)

LPI Stomaster ESE Tycoons 1
 

Improved to change the lightning rod from the original model System 3000 to replace it with the model LPI Stormaster 60 ESE, the grounding cable is a COAXIAL CABLE 80/50mm.

 

LPI Stomaster ESE Tycoons worldwide group 3

 
Start by removing the column support at the attic at this dangerous point. Therefore, work must be done with the utmost care. seat belt must have to work
The top must coordinate with the bottom as much as possible.
 
LPI Stomaster ESE Tycoons worldwide group 4
 

With the head lowered, it's time to remove the original head. and put a new head Stomaster ESE 60

LPI Stomaster ESE Tycoons worldwide group 5

Set up the pole and attach it to make it strong.

 
LPI Stomaster ESE Tycoons worldwide group

Verify that the ground system below is in perfect condition with lightning power.

Test to measure the resistance of the ground system. It reads 0.85 ohms, which is a very good value. Finish work and go home

 

ระบบป้องกันฟ้าผ่า, Early streamer emission (ESE) , Grounding system

  • Hits: 180