Skip to main content

 icon rounded facebook    icon youtube

0
0

Liva Group


lightning-protection-system-inspection-work-steel-mill-lat-lum-kaeo-district,-pathum-thani-province

31 August 2023

lightning-protection-system-installation-work,-4-story-house,-soi-suksawat-30

31 August 2023

install-a-lightning-protection-system-for-a-3-story-house-in-saphan-sung-county-2

31 August 2023

lightning-rod inspection work pak kret nonthaburi province

31 August 2023

install lightning protection Warehouse Chainat Province

24 August 2023

Lightning Protection System, Al Furqan School

21 August 2023
 

Lightning rod installation work, steel factory, Pathum Thani province

21 August 2023

Lightning rod installation work, steel factory, Pathum Thani province

21 August 2023

Lightning rod installation work, steel factory, Pathum Thani province (2)

21 August 2023

Lightning protection work at Sawang Thammasathan Foundation, Chachoengsao Province

16 March 2021
  Installation of lightning rod on a 32 meter high pole by using LIVA brand LAP-DX-250 mounted on a 27+5 meter high braided pole, bare copper grounding cable, size 70 sq.mm., threaded in a p…