Liva Group
lightning-protection-system-inspection-work-steel-mill-lat-lum-kaeo-district,-pathum-thani-province
31 August 2023
lightning-protection-system-installation-work,-4-story-house,-soi-suksawat-30
31 August 2023
install-a-lightning-protection-system-for-a-3-story-house-in-saphan-sung-county-2
31 August 2023
lightning-rod inspection work pak kret nonthaburi province
31 August 2023
install lightning protection Warehouse Chainat Province
24 August 2023
Lightning Protection System, Al Furqan School
21 August 2023
Lightning rod installation work, steel factory, Pathum Thani province
21 August 2023
Lightning rod installation work, steel factory, Pathum Thani province
21 August 2023
Lightning rod installation work, steel factory, Pathum Thani province (2)
21 August 2023
Lightning protection work at Sawang Thammasathan Foundation, Chachoengsao Province
16 March 2021
Installation of lightning rod on a 32 meter high pole by using LIVA brand LAP-DX-250 mounted on a 27+5 meter high braided pole,
bare copper grounding cable, size 70 sq.mm., threaded in a p…