圖為避雷針頭的組裝,品牌ORBITAL,型號ZERU ESE。
The picture shows the assembly of the lightning rod head, brand ORBITAL, model ZERU ESE.
鍍鋅鋼桿,高5米,由1層繩索拉動。
Galvanized steel pole, 5 meters high, pulled by 1 layer of rope.
圖為柱子的底座。
The picture shows the base of the pillar.
製作用於連接吊索的底座,以增加強度和抗風性。
Make a base for attaching the sling to increase strength and resistance to wind.
圖為水平導體和垂直導體對地的接線。
The picture shows the wiring of horizontal conductors and vertical conductors to ground.
安裝測試盒和雷擊計數器
Installing the test box and lightning counter
地面系統 (Ground system)
打土採用5/8”路堤,長3米,採用深錘擊法。然後放置混凝土池,以便下次改良土壤。
Driving the soil uses a 5/8" embankment, 3 meters long, using a deep hammering method. Then place a concrete pond to improve the soil next time.
測量並測試標準接地值不大於5歐姆。在圖中您將獲得良好的接地值。在規定的標準範圍內
Measure and test the standard ground value not more than 5 ohms. In the picture you will get a good ground value.
within the specified standard criteria
建議:您應該檢查避雷針頭的操作情況。檢查接地線。
且接地系統應改進至不超過5歐姆標準。
Recommendation: You should check the operation of the lightning rod head. Check the ground wire.
And the grounding system should be improved to a value not exceeding the standard of 5 ohms.