Installation of Lightning Protection Systems Distribution Center Farm House Rama 2 (Thung Khru)
Installed on the roof, pole 6 meters high, pulling a sling, cable THW, number 70 Sq.mm., threaded in a 1” UPVC pipe.
The assembly of the FOREND PETEX-S lightning rod to the pole tip is a hot-dip galvanized steel pipe to prevent rust. Pull the sling to prevent toppling from the wind.
The FOREND lightning rod is located on the pole 6 meters high, the base of the pole uses stainless steel scaffold together with PU to prevent water leakage, pole clamps, PVC slings to prevent rust. and prolong the service life
Lightning strike counter and ground loop welding by Exothermic welding.